Screenshots
Description
Titanic 4D Simulator VIR-TOUR – an immersive simulator that lets you experience the dramatic history of the legendary ocean liner firsthand. Explore the ship's decks and cabins, navigate from the bridge, and discover every corner of this iconic vessel. The app features stunning graphics, multiple gameplay modes including free-roam exploration with adjustable camera angles, interactive elements, and detailed environments perfect for history enthusiasts seeking an engaging and educational experience.
Features:
- Immersive virtual exploration of the Titanic;
- Detailed recreation of the ship's decks and interior spaces;
- Night mode;
- Crash simulation mode;
- Ship navigation controls.
How to install
- Download the APK file above to your phone.
- Allow “Install unknown apps” when prompted.
- Open the downloaded APK and tap Install.
- If the package includes OBB/XAPK data, follow the bundled instructions.
MOD APKs are modified builds, so Play Protect may show a warning. Install only if you trust the file; use at your own risk.





